1.Spraying project
Energized projects;
Professional protection to prevent pollution again;
Professional construction team and tools;
Construction capacity: 5 tons per day for substations; 20,000 pieces/day for transmission lines.
Protection and Cleaning |
Coated Insulators |
2.Dip-coating projects
Infrastructure and recontruction projects;
Independent research and development of professional dip coating machine;
Effectively solve the technical defects of manual spraying;
Controllable quality, smooth and flat appearance, uniform thickness, strong adhesion, etc.;
Professional packaging and transportation;
The workshop area is 3400m2, and the daily production capacity is 20,000 pieces/day.
3.Mobile Dip-coating projects
Infrastructure, recontruction and insulator replacement overhaul projects;;
Covering small area and strong flexibility;
Effectively solve the technical defects of manual spraying;
Controllable quality, smooth and flat appearance, uniform thickness, strong adhesion, etc.;
Effectively reduce the cost of repeated packaging and round-trip transportation of insulators;
The daily production capacity is 2880 pieces.